North Star: Weekly Active (WAU)
Live · rolling 7dCurrent Value
—
distinct weekly active users · all PT properties
Progress to Target
— of —
—
Definition
WAU v1 (hardcoded, decision D-5) — metric config UI & definition changelog deferred to a later milestone.
MRR Forecast
Linear regressionCurrent MRR (last snapshot)
—
Trend / month (fit slope)
—
1-Month
—
—–—
2-Month
—
—–—
3-Month
—
—–—
Method: — over — real snapshot points · band = ±1σ of residuals. A straight-line trend, not a growth model; shown only with ≥8 real points.
A/B Experiments
Descoped
— A/B test results are descoped: they require a Mixpanel / Amplitude / Optimizely
experiment API, and this dashboard is first-party only (no such source exists).
First-party experiment tracking may return as part of the M4b experiment tracker.
Growth Experiment Tracker Live
| Hypothesis | Metric | Status | Expected | Actual |
|---|---|---|---|---|
| — | ||||
CRUD via the admin API (editor+ creates/updates, admin deletes); completion requires a learnings note of at least 50 characters — institutionalized learning is the feature.
What-If Simulator
Client-side · live baselineAssumption deltas vs the live baseline trend (—):
12-Month Projected MRR
—
Δ vs Baseline (12 mo)
—
Dashed = live forecast baseline; solid = your scenario. Same linear model as the MRR forecast with your deltas applied — a trend line, not a growth model. The scenario is encoded in the URL hash: copy the address bar to share it.
Goal Tracking
Live · registry-resolved| Goal | Metric | Current | Target | Progress | Status | Days Left |
|---|---|---|---|---|---|---|
| — | ||||||
Status is computed at read time: achieved (≥ target) · at-risk (<70% of target with <30% of the period left) · on-track · missed (deadline passed). A goal whose metric can't be resolved yet shows '—' and unknown — never 0%. Goals are created via the admin API (editor+) against registry metric keys.